BG Български Book a viewing

A feeling of home.

Vitosha outside your window. Phase 4 is open for reservations.

The new Lipite building (Phase 4) among greenery: six floors around an inner courtyard

What is for sale, and where.

Lipite has three buildings. People already live in Phase 1; Phase 4 and Phase 3 are on sale. Phase 2 (block 37, south of Phase 1) has not started yet. Choose a building, then a floor, to see which apartments on it are available.

Availability is updated together with the list of apartments. The floor plans are indicative.

I'm looking for a in Or see all 78 available apartments

Two buildings on sale.

The Phase 4 building with the floors markedChoose a floor in Phase 4

Phase 4

Open for reservations

Available
58 of 73
Rooms
2, 3 and 4
Payment
10% at the preliminary contract, 10% at Act 14, 80% at the notarial deed
Reservation
€1,800 incl. VAT, deducted from the first 10%
Building permit
expected at the end of 2026
Available in Phase 4
The Phase 3 building with the floors markedChoose a floor in Phase 3

Phase 3

The building has Act 14

Available
20 of 79
Rooms
2, 3 and 4
Payment
20% at the preliminary contract, 80% at the notarial deed
Act 14
September 2026
Inner courtyard
3,000 m²
Available in Phase 3

More about the complex

Every floor has its own colour.

The common areas of Phase 4 are inspired by linden trees, and every floor has its own colour — you recognise yours as soon as the lift doors open. Choose a floor to see the available apartments on it.

  1. 5Fifth floor8 available
  2. 4Fourth floor11 available
  3. 3Third floor9 available
  4. 2Second floor10 available
  5. 1First floor13 available
  6. GGround floor, with yards7 available

The colours come from the interior design of the common areas (Archform, October 2026) and may change.

The new Lipite building (Phase 4) from the streetChoose a floor in Phase 4
The inner courtyard of the completed Phase 1 — lawn, trees and the playgroundPhotoMore photos of Phase 1

Phase 1 is already home.

The buildings are completed and lived in. The courtyard has paths, benches and a playground — these are photos from here, not visualisations.

Take a 360° walk.

Walk around the courtyard, the entrance and the show apartment in the completed Phase 1 — from home, before your visit.

See the gallery

Everything you need is a few minutes' walk away.

  • 2 minto the bus stops
  • 5 minto the supermarkets
  • 11 minto Mall Bulgaria
  • 14 minto the tram stop
  • 15 minto South Park
See the map with the routes
Map of the neighbourhood with Lipite, the shops, schools and South Park

How construction is progressing.

  1. 2023The first stage of Phase 1 is commissioned.
  2. 2024The second stage of Phase 1 is commissioned.
  3. 2025Phase 3 starts.
  4. 2026Phase 3 reaches Act 14. Reservations for Phase 4 open on 13 October.
  5. End of 2026Expected building permit for Phase 4 and preliminary contracts.

The construction photos are in the gallery. See the gallery

The Phase 3 building in September 2026, with the cranes still on sitePhoto, September 2026Construction month by monthChoose a floor in Phase 3

Frequently asked questions.

How do I find out the price of an apartment?

Open the apartment and request a price offer. It opens straight away, and you receive a copy by email.

Are a parking space and a storage room included?

Yes, every offer includes a parking space and a storage room.

Can I see a finished apartment?

Yes. The show apartment is in Phase 1 — we show it during a meeting at the sales office.

Can I visit the construction site?

No, the construction site is not open for visits. Photos of it are in the gallery on the website.

When is the preliminary contract for Phase 4 signed?

After the building permit (expected at the end of 2026). Until then, a reservation agreement is signed.

Visit our sales office.

We will show you the available apartments and the show apartment in Phase 1.

11 Boyan Petrov Street; 1404 Sofia, Manastirski Livadi-Iztok district

Hercesa has been building homes for more than 50 years and has delivered over 30,000. Phase 3 has Act 14; Phase 4 is open for reservations.

The Lipite sales office on site